Brief: Discover the Q345B Steel Fireproof Coatings 2h Seismic Compliance GB50011 BIM LOD300 Hot-Dip Galvanizing ≥80μM Industrial Design Style Warehouse Steel Structure Building. This high-strength prefab steel structure warehouse offers custom sizes, quick installation, and is ISO-certified for durability and eco-friendliness. Perfect for industrial building solutions.
Related Product Features:
High-strength Q345B steel columns and beams with yield strength ≥345MPa for superior load-bearing capacity.
Hot-dip galvanizing ≥80μm or epoxy zinc-rich coatings for enhanced corrosion protection.
Fireproof coatings integrated for up to 2 hours of fire resistance.
Seismic resistance up to magnitude 8, compliant with GB50011 standard.
Prefabrication rate ≥90%, reducing on-site assembly time by 50%.
Customizable spans (15-150m) and heights (6-9m per floor) for diverse industrial needs.
BIM modeling (LOD300 precision) for clash detection and maintenance planning.
10-year warranty with annual anti-corrosion inspections for long-term reliability.
Perguntas Frequentes:
What materials are used in the primary framework of the steel structure warehouse?
The primary framework includes steel columns (Q345B material), H-shaped steel beams, and truss systems interconnected via high-strength bolts (Grade 10.9) for a stable load-bearing frame.
How long does it take to construct a standard 1,000m² factory building?
A standard 1,000m² factory building can be completed in 15-30 days due to the high prefabrication rate (≥90%) and reduced on-site assembly time.
What certifications does the steel structure warehouse comply with?
The steel structure warehouse complies with ISO9001, CE, and China's industrial building codes, ensuring high-quality standards and international compliance.